detail
Date: 08/05-08/06/26 (mix through bake). PLAIN - no additions/toppings, confirmed directly by USR369 08/19/26 (herb comment was about the group/Bakes 3 and 6 generally, not this one). RESULT: fine, no issues (confirmed 08/09/26); came out good, good taste (confirmed 08/19/26). Full mix/fold/retard/bake timeline not separately recorded - only date and result confirmed. This bake precedes Bake #8 (dill + everything bagel, 08/09/26).