Bake #3 in progress with mid-course bottom-burn fix (450F + cookie sheet), jam 3-phase plan agreed (
system:
08 Kitchen
Bake #3 in progress with mid-course bottom-burn fix (450F + cookie sheet), jam 3-phase plan agreed (doubling batch), jar sterilizing underway. Fixed bake-loggin …
Bake #3 in progress with mid-course bottom-burn fix (450F + cookie sheet), jam 3-phase plan agreed (doubling batch), jar sterilizing underway. Fixed bake-logging discipline to write system DB events instead of inbox-only. Found and logged K161: file_write_web.php append mode data-loss on LEGACY-08.md.
work_done
Logged Bake #3 progress events (ID17,18) to 80-sys.db; updated handoff-08.md with substantive state; appended LEGACY-08.md (discovered append mode wiped prior content - K161 logged); advised on jam phases/sugar preservation/doubling risk/jar sterilizing.
Series H adopted. All 26 inbox messages + standing orders absorbed. Gov/ files fully corrected — O
system:
08 Kitchen
Series H adopted. All 26 inbox messages + standing orders absorbed. Gov/ files fully corrected — OPEN.php now loads all 5. LINK-80.md created. Two WISDOM entr …
Series H adopted. All 26 inbox messages + standing orders absorbed. Gov/ files fully corrected — OPEN.php now loads all 5. LINK-80.md created. Two WISDOM entries logged.
work_done
Series H EXEC_OPEN deployed. Master open report sent (ID 144). 26 inbox + 26 transfers delivered. LINK-80.md created (D277). All 5 gov/ files updated to D284 handoff structure + new directives. Critical fix: gov files renamed to -08 suffix so OPEN.php loads them — both -08 and -80 now exist. COMMANDS-08.php confirmed working. Mistakes K018+K019 logged.
description
Series H adopted. All 26 inbox messages + standing orders absorbed. Gov/ files fully corrected — OPEN.php now loads all