sessions — Row #26
10-sys.db · systems/10-master/data/
summary
Verified Server [40] Phase 1 work (commands PHP, 05-Front_end live). Fixed EXEC_OPEN Series F dropzone gap — all 11 files embedded inline in backend/369/ as blob download (WAF blocks .txt writes). Rebuilt board.html — active tasks top, roster bottom. Added bottom tabs to panel.html and backend/index.html. Backed up 5 files. Dropped T408 restructure Phase 1 work order to Server [40]. Updated restructure tracker v1.5 — Phase 0 done, Phase 1 active.
work_done
board.html v5.18 · panel.html tabs · backend/index.html tabs · knowledge-01.md · restructure.html v1.5 · dropzone Series F deploy · T408 to Server [40]
description
Verified Server [40] Phase 1 work (commands PHP, 05-Front_end live). Fixed EXEC_OPEN Series F dropzone gap — all 11 file
▼ Show timestamps
closed_at
2026-07-09 13:48:26
opened_at
2026-07-09 12:19:00