detail
T741 asked for an offsite disaster-recovery zip. SOP-OFFSITE.md (live, read this session) states directly: 'T741 substance now done -- schedule still needs USR369 confirmation.' The backend-only zip was built and delivered 08/14/26 (1,383 files, 11.3MB, backend_offsite_08_14_26_242pm.zip), bootstrap script confirmed self-deleted per the SOP's own step 6. The only open piece is USR369 confirming a monthly cadence, which is an owner decision, not further Master work -- closing the build task; cadence confirmation can be tracked separately if USR369 wants a recurring schedule.